India awards long-duration energy storage contracts for 1,344MW pumped hydro, utility-scale flow battery
energy-storage.news Jul 21, 2026

India awards long-duration energy storage contracts for 1,344MW pumped hydro, utility-scale flow battery

AI-summarised brief · reviewed before publication

The Solar Energy Corporation of India (SECI) awarded 1,344 MW of pumped‑hydro capacity through a reverse‑auction to Tata Power (324 MW), Greenko (720 MW) and Torrent Energy Storage Solutions (300 MW), under tariff‑based competitive bidding and long‑term PPAs. The tender, launched in late 2025, was revised to target up to 1,500 MW of 12‑hour storage, reflecting the nation’s push for long‑duration energy storage (LDES). Simultaneously, Indian startup Delectrik secured a contract to supply a 100 MWh vanadium redox flow battery for the 30 GW Gujarat Hybrid Renewable Energy Park, marking the country’s first large‑scale flow‑battery deployment. SECI’s contracts follow a broader policy drive that includes streamlined clearances, transmission charge waivers and an estimated need for 74 GW of storage by 2032, rising to 90 GW of pumped hydro by 2047.

💡 Why It Matters

  • · The dual awards accelerate India’s transition to grid‑scale, multi‑hour storage, directly addressing the capacity gap needed to balance its rapidly expanding renewable fleet.