Largest BESS in Czech Republic commissioned, supplied by CATL-backed CNTE
AI-summarised brief · reviewed before publication
The Modlany Energy Park in the Czech Republic has been commissioned, becoming the nation’s largest grid‑scale battery energy storage system (BESS). The facility pairs 42.7 MW of solar photovoltaic capacity with a 37.95 MW/41.7 MWh BESS supplied by Contemporary Nebula Technology Energy (CNTE), a firm in which CAT Lithium (CATL) holds a 20 % stake. CNTE installed eleven STAR T‑285 liquid‑cooled containers, each delivering 3.45 MW and 3.793 MWh, designed for 1‑P operation and 1‑4 hour discharge durations. Built on a former mining site by EPC contractor Greenbuddies, the project cost CZK 1.2 billion (≈US$57 million) and will provide fast‑response frequency regulation and grid‑balancing services. Katemo Group, the apparent owner, may expand the storage capacity to 130 MWh in the future.
💡 Why It Matters
- · The deployment showcases how Chinese‑backed battery technology is rapidly scaling in Central Europe, directly enhancing grid stability and renewable integration in a region still reliant on coal.